01
One counterpart
Industri Nord does not have a workshop of its own. The steel is built by workshops in Norway, never by unknown shops through a tender.
You deal with one counterpart, and we take responsibility for price, date and result. Our margin is in the fixed price.
02
Why it is built this way
Many sell the drawing or the quote. We take responsibility for getting production right. The value is in everything that happens after the drawing: the right workshop, what a fixed price is built on, the inspection, the crane, the date, and the responsibility when something goes wrong.
That is what our margin pays for. You do not pay to be put in touch with someone. You pay for one party that holds the whole run, from the request to the lift on site.
Tender portals send the drawing out, and the cheapest bid wins. We choose the workshop by what the job requires.
03
From request to lift
The run is the same for one frame and for a row of skids.
- Request
- You send drawings or a scope.
- Reply
- We reply within 24 hours.
- Price
- You get a fixed price and a delivery date.
- Build
- The workshop builds, and you can inspect before shipping.
- Transport
- The unit travels to site by road, braced for transport.
- Lift
- One lift onto the pad, ready to anchor and connect.
04
How much you can order
You choose how much is done before it leaves the shop.
- Steel
- Frame fabricated to your drawings, with lift points and surface treatment.
- Mounted
- Your equipment set and aligned on the frame.
- Piped and wired
- Piping, cable routes and connections completed in the shop.
- Tested
- Factory acceptance test with documentation before transport.
Steel is the confirmed scope. The other levels are agreed in the quote.
See the four levels05
What we need to quote
Drawings are the shortest way to a price. Send what you have, even if it is not complete.
- Equipment and loads
- Manufacturer drawings and weights for everything mounted on the frame.
- Interfaces
- Bolt patterns, pipe and cable entry points, anchor layout.
- Lifting and transport
- How the unit will be lifted and any limits on size for the road.
- Environment and finish
- Indoor or outdoor, and the surface treatment you require.
- Scope
- Steel only, or with mounting, piping, wiring and testing.
- Quantity and dates
- Number of units and when they must be on site.