An equipment platform is a steel deck that carries chillers, dry coolers or generators above a roof or a yard.

A chiller gantry is the same idea in a taller frame, with the cooling units on top and room for pipes and people below. Both are built in sections in the shop and bolted together on site.

Send drawings

Proposed range. The scope is confirmed in the quote. Images are rendered models.

Rendered model: Equipment platforms and gantries

01 — Frame

What we fabricate

The platform is the part of a data center that stands in the weather and carries the heaviest moving machines. It is designed for the day a unit is lifted out as much as for the day it is lifted in.

Primary frame
Columns, main beams and bracing, with bolted connections sized for site assembly.
Equipment beams
Steel under each unit, placed for its support points, with brackets for vibration mounts.
Deck
Open grating for walkways, so snow and water fall through. Plate where a spill must be contained.
Stairs, ladders and handrail
Access for service, with dimensions that follow EN ISO 14122.
Pipe and cable supports
Brackets under the deck for the mains, so they are not hung afterwards.
Roof steel
Low frames that spread the load of a unit across the roof beams. In North America this is called roof dunnage.

02 — Placement

Where it goes

On the roof
Chillers and air handling units on a steel frame that lands on the building's columns. The connection to the building is the difficult part, and it is designed with the structural engineer.
In the yard
A free-standing gantry on its own foundations, with dry coolers or chillers on top and pump skids and pipework underneath.
Beside the building
A generator or transformer platform at loading dock height, with stairs and a bund.
Inside
Service platforms around tall equipment, and crossovers above pipe runs.

03 — Specify

What to specify for an equipment platform

Equipment
Operating weight, support points and vibration data for each unit.
Why it mattersThe operating weight is higher than the shipping weight, and the support points are fixed by the maker.
Layout
Plan with unit spacing and service clearances.
Why it mattersAir-cooled units need free air on all sides, and the spacing sets the size of the deck.
Site loads
Location, height above ground and exposure.
Why it mattersWind on a row of tall units, and snow between them, are among the largest loads.
Supporting structure
Column grid and the load the building or the foundation can take at each point.
Why it mattersThe platform is only as strong as what it stands on.
Noise and vibration
Isolator type, and whether an acoustic screen is fitted.
Why it mattersScreens catch wind, and their load goes into the frame.
Access
Who goes up, how often, and with what tools.
Why it mattersDecides stairs or ladders, and the width of the walkways.
Maintenance lifts
The heaviest part that will be replaced, and how.
Why it mattersDecides whether a lifting beam is built in.
Finish
Hot-dip galvanized, or galvanized and painted.
Why it mattersA platform is outdoors for its whole life. Coastal sites need the heavier system.
Assembly
Crane reach, and the largest section the site can lift.
Why it mattersSets how the frame is split and how many bolts are fitted in the air.
Future units
Positions that are empty on day one.
Why it mattersSteel for a later chiller costs little now and a great deal afterwards.
Send drawings

04 — Checks

Checked before it leaves the shop

Hole patterns
Checked for the equipment against the unit drawings.
Dimensions and levels
Columns and beams are measured.
Galvanizing
Checked for thickness, and for straightness after the bath.
Handrail, stairs and grating
Checked against the access standard.
Marking
Every part is marked to the erection drawing, with a bolt list.

05 — Scope

Steel only, or the complete skid

You choose how much is done before it leaves the shop.

  1. Level 01

    Steel

    Frame fabricated to your drawings, with lift points and surface treatment.

  2. Level 02

    Mounted

    Your equipment set and aligned on the frame.

  3. Level 03

    Piped and wired

    Piping, cable routes and connections completed in the shop.

  4. Level 04

    Tested

    Factory acceptance test with documentation before transport.

How it works

06 — Process
  1. 01

    You send drawings or a scope.

  2. 02

    We reply within 24 hours.

  3. 03

    You get a fixed price and a delivery date.

  4. 04

    The workshop builds, and you can inspect before shipping.

  5. 05

    The unit travels to site by road, braced for transport.

  6. 06

    One lift onto the pad, ready to anchor and connect.

Send drawings

24 h reply

Drawings, a sketch or a scope. Send what you have and we reply within 24 hours.

Send drawings

07 — FAQ

Questions

What is a chiller gantry?

A chiller gantry is a raised steel frame that carries chillers or dry coolers in a row, with open space below for pipework, pump skids and access. It is used when a data center has no roof space for cooling, or when the units must stand clear of the ground for air flow.

What is the difference between an equipment platform and a mezzanine?

An equipment platform is designed for the loads and the access needs of specific machines. A mezzanine is an extra floor for storage or people, designed for an even load per square meter. A platform under a chiller is sized for point loads, vibration and wind, which a mezzanine is not.

What is roof dunnage?

Roof dunnage is the North American term for the steel frame that lifts mechanical equipment above a roof and carries its weight to the building's columns. In Europe the same structure is usually called a roof platform, a plant deck or secondary steel for plant.

Why is grating used instead of plate?

Grating lets rain, snow and air pass through. A platform with plate decks collects water and ice, and it blocks the air that air-cooled units draw from below. Plate is used only where a leak has to be collected, under a pump or a transformer.

Can more units be added later?

Yes, if the frame was designed for it. The columns, the foundations and the main beams are sized for the full row from the start, and the positions for later units are left with their bolt holes ready. Adding capacity that was not planned usually means new columns.

Read the guide